CX-009785: Categorical Exclusion Determination

Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

January 7, 2013
Estimated Read Time   min
Roosevelt Radio Station Emergency Generator Removal and Replacement
CX(s) Applied: B1.3
Date: 01/07/2013
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to maintain and improve the Roosevelt Radio Station. The proposed work includes removal and replacement of the existing 30-kilowatt (kW) engine generator, installation of automatic transfer switch, bypass switches and all related components, supports, and appurtenances.