Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
January 8, 2013Rogue-Gold Beach No. 2 Disconnect Switch Replacement
CX(s) Applied: B4.6
Date: 01/08/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) and Coos-Curry Electric Cooperative, Inc. (Coos- Curry) have developed a joint plan to replace the existing B-1734 115-kilovolt, group-operated disconnect switch located at BPA’s Gold Beach Substation with a new horizontally-mounted, 1600 Amp disconnect switch and load break attachment.
CX(s) Applied: B4.6
Date: 01/08/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) and Coos-Curry Electric Cooperative, Inc. (Coos- Curry) have developed a joint plan to replace the existing B-1734 115-kilovolt, group-operated disconnect switch located at BPA’s Gold Beach Substation with a new horizontally-mounted, 1600 Amp disconnect switch and load break attachment.