Coulee-Westside Transfer Trip Replacement CX(s) Applied: B1.7 Date: 02/06/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 6, 2013Coulee-Westside Transfer Trip Replacement
CX(s) Applied: B1.7
Date: 02/06/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista’s Westside Substation and the Bureau’s Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line.
CX(s) Applied: B1.7
Date: 02/06/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista’s Westside Substation and the Bureau’s Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line.