High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, A11, B3.6 Date: 09/20/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 20, 2012High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II
CX(s) Applied: A9, A11, B3.6
Date: 09/20/2012
Location(s): Colorado
Offices(s): National Energy Technology Laboratory
Laboratory and water tank testing of a 3D laser imaging system for use in inspection, maintenance, and repair of UDW assets.
CX(s) Applied: A9, A11, B3.6
Date: 09/20/2012
Location(s): Colorado
Offices(s): National Energy Technology Laboratory
Laboratory and water tank testing of a 3D laser imaging system for use in inspection, maintenance, and repair of UDW assets.