CX-009272: Categorical Exclusion Determination

Building 94 Facade Restoration CX(s) Applied: B1.3 Date: 09/10/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

September 10, 2012
Estimated Read Time   min
Building 94 Facade Restoration
CX(s) Applied: B1.3
Date: 09/10/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory

Replace caulking in the horizontal expansion joints and the vertical control joints on the Building 94 exterior brick walls. Tuckpoint mortar joints and cracked bricks on the Building 94 exterior walls.