Project L-718, Electrical Utilities Transformer Management Support Facility CX(s) Applied: B1.15 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Office of NEPA Policy and Compliance
September 4, 2012Project L-718, Electrical Utilities Transformer Management Support Facility
CX(s) Applied: B1.15
Date: 09/04/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
The proposed action includes design, procurement, and construction of a pre-engineered metal building for transformer management; including inspections, routine maintenance, testing, refurbishing, and disposition of excess transformers.
CX(s) Applied: B1.15
Date: 09/04/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
The proposed action includes design, procurement, and construction of a pre-engineered metal building for transformer management; including inspections, routine maintenance, testing, refurbishing, and disposition of excess transformers.