Elmwood Dog Kennel Repair (Hurricane Isaac) CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
September 24, 2012Elmwood Dog Kennel Repair (Hurricane Isaac)
CX(s) Applied: B1.3
Date: 09/24/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to repair damage to the Elmwood Dog Kennel caused by Hurricane Isaac.
CX(s) Applied: B1.3
Date: 09/24/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, tools, equipment, and supervision required to repair damage to the Elmwood Dog Kennel caused by Hurricane Isaac.