September 19, 2012Respond to the Town of Eatonville’s Land Use Review Request (LURR)
CX(s) Applied: B4.7
Date: 09/19/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to allow the Town of Eatonville to complete a cable connection between BPA’s Lynch Creek substation and an existing vault.
CX(s) Applied: B4.7
Date: 09/19/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to allow the Town of Eatonville to complete a cable connection between BPA’s Lynch Creek substation and an existing vault.