To accommodate the upcoming Alternate Feedstock (AFS-2) Campaign, the Can Inerting System in Room 555 of HB-Line must be modified. Rev 0 of this categorical exclusion changed the inerting gas from argon to nitrogen. Revision 1 changed the inerting gas to carbon dioxide (CO2). This revision (Rev 2) changes the inerting gas from CO2 back to nitrogen.
CX(s) Applied: B1.31
Date: 07/20/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
To accommodate the upcoming Alternate Feedstock (AFS-2) Campaign, the Can Inerting System in Room 555 of HB-Line must be modified. Rev 0 of this categorical exclusion changed the inerting gas from argon to nitrogen. Revision 1 changed the inerting gas to carbon dioxide (CO2). This revision (Rev 2) changes the inerting gas from CO2 back to nitrogen.