Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA
Office of NEPA Policy and Compliance
December 6, 2012Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA
This EA evaluates the environmental impacts of a proposal by DOE’s Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features.
Please note: Together, the Draft EA and the Revision to the Draft EA constitute the Final EA.