Flexible Assembly Solar Technology CX(s) Applied: A9, B3.6, B5.17 Date: 08/22/2012 Location(s): California Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
August 22, 2012"Flexible Assembly Solar Technology
CX(s) Applied: A9, B3.6, B5.17
Date: 08/22/2012
Location(s): California
Offices(s): Golden Field Office
The U.S. Department of Energy (DOE) is proposing to provide funding to Bright Source to design, build, and demonstrate a Flexible Assembly Solar Technology (FAST) system that is intended to achieve cost reduction and save time associated with construction of the solar field."