Bonneville Power Administration (BPA) proposes to remove soil between structure 58/3 and 58/4 on the 500-kilovolt (kV) Wautoma-Ostrander No. 1 transmission line.
CX(s) Applied: B1.3
Date: 08/01/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to remove soil between structure 58/3 and 58/4 on the 500-kilovolt (kV) Wautoma-Ostrander No. 1 transmission line.