CX-008888: Categorical Exclusion Determination

North Bonneville-Midway No. 1 Tower 75/4 Replacement CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

August 1, 2012
Estimated Read Time   min
North Bonneville-Midway No. 1 Tower 75/4 Replacement
CX(s) Applied: B1.3
Date: 08/01/2012
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and reliable operation of this critical line.