Raver Substation-Control House Expansion & Seismic Retrofit CX(s) Applied: B4.11 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 14, 2012Raver Substation-Control House Expansion & Seismic Retrofit
CX(s) Applied: B4.11
Date: 08/14/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to expand the control house at BPA fee-owned Raver Substation and seismically retrofit the existing structure.
CX(s) Applied: B4.11
Date: 08/14/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to expand the control house at BPA fee-owned Raver Substation and seismically retrofit the existing structure.