Dredging of the West Hackberry Raw Water Intake Structure CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
August 14, 2012Dredging of the West Hackberry Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 08/14/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, tools, equipment, supplies, transportation, labor, supervision, and services required to perform the work associated with the dredging of the West Hackberry Raw Water Intake Structure approach channel of mud, silt, and debris, to include cleaning the pump intake sump.
CX(s) Applied: B1.3
Date: 08/14/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, tools, equipment, supplies, transportation, labor, supervision, and services required to perform the work associated with the dredging of the West Hackberry Raw Water Intake Structure approach channel of mud, silt, and debris, to include cleaning the pump intake sump.