Buildings 12-64/12-84 Electrical Equipment Installation CX(s) Applied: B1.3, B1.15 Date: 07/25/2012 Location(s): Texas Offices(s): Pantex Site Office
Office of NEPA Policy and Compliance
July 25, 2012Buildings 12-64/12-84 Electrical Equipment Installation
CX(s) Applied: B1.3, B1.15
Date: 07/25/2012
Location(s): Texas
Offices(s): Pantex Site Office
This project would involve replacing, relocating, and installing electrical equipment for Buildings 12-64 and 12-84 that were damaged in a flood. As part of this, two pre-engineered, metal, self-contained air conditioned buildings would be installed at Building 12-64.