Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation CX(s) Applied: B1.4 Date: 05/09/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
May 9, 2012Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation
CX(s) Applied: B1.4
Date: 05/09/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment.
CX(s) Applied: B1.4
Date: 05/09/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The proposed project will install an additional air conditioning (A/C) unit in the IORC (IF-608). Universal Power Supply (UPS) and server equipment are being relocated from rooms B-3 and B-6 to room E-6. The current A/C system that cools room E-6 is not adequate to cool the relocated equipment.