Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line CX(s) Applied: B3.6 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
May 17, 2012Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line
CX(s) Applied: B3.6
Date: 05/17/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The Colorado School Mines (CSM) project has three objectives: upgrade CSM’s Neutron Imaging Beam-Line, provide additional neutron detection and measurement equipment, and obtain the image conversion foils needed to conduct film-based neutron radiography.
CX(s) Applied: B3.6
Date: 05/17/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The Colorado School Mines (CSM) project has three objectives: upgrade CSM’s Neutron Imaging Beam-Line, provide additional neutron detection and measurement equipment, and obtain the image conversion foils needed to conduct film-based neutron radiography.