Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 21, 2012Munro Control Center Expansion
CX(s) Applied: B1.15
Date: 06/21/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to build a 30,000 square foot (sf) expansion to the east side of the existing building and a total of 53,500 sf of additional paved surfaces for access roads and parking to the north of the existing Munro Control Center.