Bonneville Power Administration proposes to install metering equipment within Whakiakum public utility district’s expanded Cathlamet Substation.
CX(s) Applied: B4.6
Date: 07/02/2011
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to install metering equipment within Whakiakum public utility district’s expanded Cathlamet Substation.