Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 23, 2012Columbia and Willamette River Crossings Liquefaction Hazard Assessment
CX(s) Applied: B3.1
Date: 07/23/2012
Location(s): Oregon, Oregon, Washington, Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform geotechnical testing at four transmission line river crossings on the Columbia and Willamette rivers. Geotechnical testing would assess the capacity of the soils in these areas to undergo liquefaction. Results of the testing would be used evaluate the need for seismic hardening of the transmission towers in these areas.
CX(s) Applied: B3.1
Date: 07/23/2012
Location(s): Oregon, Oregon, Washington, Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform geotechnical testing at four transmission line river crossings on the Columbia and Willamette rivers. Geotechnical testing would assess the capacity of the soils in these areas to undergo liquefaction. Results of the testing would be used evaluate the need for seismic hardening of the transmission towers in these areas.