Remove Roof Over the North-east Spill Basin 235-F CX(s) Applied: B1.23 Date: 06/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 18, 2012Remove Roof Over the North-east Spill Basin 235-F
CX(s) Applied: B1.23
Date: 06/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Construction will be removing a roof structure over the North-East Spill basin of 235-F. The debris that is removed will be sent for recycle (all metal).
CX(s) Applied: B1.23
Date: 06/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Construction will be removing a roof structure over the North-East Spill basin of 235-F. The debris that is removed will be sent for recycle (all metal).