Replace 607-6A Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 20, 2012Replace 607-6A Sanitary Sewer Lift Station
CX(s) Applied: B1.3
Date: 06/20/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The existing 607-6A sanitary sewer lift station has reached the end of its design life and the components have deteriorated and are no longer functioning. The existing lift station components will be removed and replaced with a Gorman-Rupp Above Ground Submersible Valve Package furnished by Savannah River Nuclear Solutions.
CX(s) Applied: B1.3
Date: 06/20/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The existing 607-6A sanitary sewer lift station has reached the end of its design life and the components have deteriorated and are no longer functioning. The existing lift station components will be removed and replaced with a Gorman-Rupp Above Ground Submersible Valve Package furnished by Savannah River Nuclear Solutions.