Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 20, 2012Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells
CX(s) Applied: B3.1
Date: 06/20/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The steam injection phase at the Western Sector Dynamic Underground Stripping (DUS) Project has ended. At this time 55 of the 63 steam injection wells are ready for abandonment. The other five wells are still being used for air sparging purposes. The 55 wells will be abandoned in place by grouting per Manual 3Q1.
CX(s) Applied: B3.1
Date: 06/20/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The steam injection phase at the Western Sector Dynamic Underground Stripping (DUS) Project has ended. At this time 55 of the 63 steam injection wells are ready for abandonment. The other five wells are still being used for air sparging purposes. The 55 wells will be abandoned in place by grouting per Manual 3Q1.