CX-036425: Garrison-Taft No. 1 Interphase Repair Project

Bonneville Power Administration (BPA) proposes to perform in-kind replacement of the interphase and hardware between structures 80/2 and 80/3 on th…

Office of NEPA Policy and Compliance

September 24, 2026
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to perform in-kind replacement of the interphase and hardware between structures 80/2 and 80/3 on the Garrison-Taft No. 1 transmission line via helicopter on private land in Missoula County, Montana. This work is necessary to maintain a safe and reliable high voltage transmission system and is anticipated to have a line outage in October 2026 for approximately three days.