CX-036401: Building 510 Substation

This project is a continuation of the Building 510 upgrade to the electrical distribution system. This project involves the complete removal and up…

Office of NEPA Policy and Compliance

September 24, 2026
Estimated Read Time   min

This project is a continuation of the Building 510 upgrade to the electrical distribution system. This project involves the complete removal and upgrade of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear.  It includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling.