This project consists of milling the existing asphalt parking lots located at 704-N, removing and disposing of milled materials, preparing the surf…
Office of NEPA Policy and Compliance
July 23, 2026This project consists of milling the existing asphalt parking lots located at 704-N, removing and disposing of milled materials, preparing the surface, resurfacing, and re striping the paved area.