CX-036195: 120V Power and Network Cable for L-Area VMAC Remote Workstation (RWS) in H-Area

120V Power and Network are needed in the H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition. Also, 120V power is neede…

Office of NEPA Policy and Compliance

July 28, 2026
Estimated Read Time   min

120V Power and Network are needed in the H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition. Also, 120V power is needed for the L-Area Announcement Equipment. 120V Power will need to be fed from an available Lighting Panel. Network ethernet cable from the workstation will need to be routed to the Network Cabinet in the Control Room.