Burlington Electric Department (BED) proposes to rebuild 0.6 miles of existing overhead distribution lines along Institute Road and Howard Street i…
Office of NEPA Policy and Compliance
April 23, 2026Burlington Electric Department (BED) proposes to rebuild 0.6 miles of existing overhead distribution lines along Institute Road and Howard Street in Burlington, VT, including 8 pole replacements, replacing bare conductor with insulated wire, and replacing all associated distribution hardware.