CX-035487: Access Road Bridge Replacements Near Structures 96/3 and 97/3 on the Chief Joseph-Monroe No. 1 Transmission Line (update to CX determination issued on March 19, 2026)

Bonneville Power Administration (BPA) proposes to replace two temporary access road bridges located near structures 96/3 and 97/3 of the Chief Jose…

Office of NEPA Policy and Compliance

March 30, 2026
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to replace two temporary access road bridges located near structures 96/3 and 97/3 of the Chief Joseph-Monroe No. 1 Transmission Line. Two new 16-foot by 60-foot-long permanent bridges would be installed to assure safe and reliable access for BPA's transmission line maintenance crews accessing BPA's rights-of-way (ROW).