In preparation for the new 69 KV reroute Substation at CFA, the following modifications to the power management infrastructure will be implemented:…
Office of NEPA Policy and Compliance
July 22, 2025In preparation for the new 69 KV reroute Substation at CFA, the following modifications to the power management infrastructure will be implemented: Specifically, this project involves the following steps: Removal of the distribution cables from power pole No. 2 to pole No. 3. These cables will be installed in an underground trench and rerouted to a riser on power pole No. 3, Pole No. 1 and No. 2 will be shortened to a height of approximately 40 feet. Distribution lines will then be raised to a height of approximately 38 feet, A 2 pole tangent structure with a pole height of 84.5 feet will be placed near pole No. 2.