The project consists of a feasibility study of CPU's two existing backup generation units and assessment of future upgrade options, targeted upgrad…
Office of NEPA Policy and Compliance
December 11, 2025The project consists of a feasibility study of CPU's two existing backup generation units and assessment of future upgrade options, targeted upgrades to CPU's two existing generating units based on the results of the initial feasibility study, replacement of an aging oil circuit breaker with a SF-6 circuit breaker and the installation of a system-wide Outage Management System (OMS).