CX-035017: Smart Technology for Advanced Resilient Transmission (START)

Re-conductor existing transmission lines (Bicknell to 3 Points 115 kV line and 3 Points to Sandario Tap 115 kV line) and replace one static conduct…

Office of NEPA Policy and Compliance

December 5, 2025
minute read time

Re-conductor existing transmission lines (Bicknell to 3 Points 115 kV line and 3 Points to Sandario Tap 115 kV line) and replace one static conductor with fiber on the existing Sandario Tap to Sandario Sub 115 kV line.