Install the ADA technology at the Orsted Ford Ridge wind farm. The system will be designed to integrate with the plant's SCADA operational (OT) net…
Office of NEPA Policy and Compliance
November 17, 2025Install the ADA technology at the Orsted Ford Ridge wind farm. The system will be designed to integrate with the plant's SCADA operational (OT) network and passively monitor for anomalies over a minimum period of six months. No changes to plant operations will result due to the demonstration.