Hanford Mission Integration Solutions (HMIS) and their subcontractors perform construction of electric powerlines approximately 10 miles in length …
Office of NEPA Policy and Compliance
November 19, 2025Hanford Mission Integration Solutions (HMIS) and their subcontractors perform construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way.