CX-034524: FY19 Maupin-Redmond No. 1 21/6,Redmond District Priority Pole

The Bonneville Power Administration (BPA) proposes to replace structure 21/6 on the Maupin-Redmond No. 1 transmission line with in-kind replacement…

Office of NEPA Policy and Compliance

September 16, 2025
minute read time

The Bonneville Power Administration (BPA) proposes to replace structure 21/6 on the Maupin-Redmond No. 1 transmission line with in-kind replacement of a wood pole and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.) in the Redmond Transmission Line Maintenance (TLM) District.