New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the reb…
Office of NEPA Policy and Compliance
September 9, 2025New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the rebuild and re-conductoring of an existing overhead line (approx. 5.5 mile).