CX-034297: Increasing Reliability and Grid Resiliency in Underserved Areas

Replace existing copper overhead conductors with No. 2 Aluminum Conductor, Steel Reinforced (ACSR) within the CEC territory in Clay County, FL. Add…

Office of NEPA Policy and Compliance

July 28, 2025
minute read time

Replace existing copper overhead conductors with No. 2 Aluminum Conductor, Steel Reinforced (ACSR) within the CEC territory in Clay County, FL. Additionally, CEC is conducting vegetation and fuel load management along the copper line replacement areas. This includes mowing, herbicide spraying, and systemic re-cutting to maintain clearances.