Bonneville Power Administration (BPA) is proposing to replace Lexington-Longview No. 1 structure 9/1 and any associated hardware and guys. The stru…
Office of NEPA Policy and Compliance
July 10, 2025Bonneville Power Administration (BPA) is proposing to replace Lexington-Longview No. 1 structure 9/1 and any associated hardware and guys. The structure proposed for replacement is currently in a landslide and is moving down the hillside. The proposed project would move the structure back on line approximately 50 feet away from the landslide to a more stable location.