18 aged transmission poles and 1.5 miles of transmission line with distribution line under will be replaced. Pole holes dug with auger or backhoe. …
Office of NEPA Policy and Compliance
June 2, 202518 aged transmission poles and 1.5 miles of transmission line with distribution line under will be replaced. Pole holes dug with auger or backhoe. Backfilled with native soil.