Replace 32 poles, transfer 59 poles, replace 11,000' of OH 336 spacer with 477 spacer cable, replace 8,100' of 3-500 13.8KV cable with 3-700 15KV, …
Office of NEPA Policy and Compliance
June 10, 2025Replace 32 poles, transfer 59 poles, replace 11,000' of OH 336 spacer with 477 spacer cable, replace 8,100' of 3-500 13.8KV cable with 3-700 15KV, install 4 new pad-mount 13.8 KV switches, and Install (4) 13.kv re-closers.