Replace 116 utility poles in place (with taller poles), transfer an existing medium voltage circuit, secondaries, and telecom equipment to the new …
Office of NEPA Policy and Compliance
March 20, 2025Replace 116 utility poles in place (with taller poles), transfer an existing medium voltage circuit, secondaries, and telecom equipment to the new poles, remove an existing medium voltage aerial cable circuit, install a new medium voltage spacer cable circuit on the new poles - approximately 7,700 ft.