CX-033098: Taylor Bridge Replacement

The scope of this project is to remove the existing Taylor Blvd. Bridge and replace it with a bridge having a similar design and layout.…

Office of NEPA Policy and Compliance

January 15, 2025
Estimated Read Time   min

The scope of this project is to remove the existing Taylor Blvd. Bridge and replace it with a bridge having a similar design and layout.