Condensate Return Piping Replacement Project (T-40 to B-22) CX(s) Applied: B1.3, B1.15 Date: 06/12/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
June 12, 2012Condensate Return Piping Replacement Project (T-40 to B-22)
CX(s) Applied: B1.3, B1.15
Date: 06/12/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Install condensate return piping, insulation, piping support, and specific valves in the condensate return piping sections from T-40 to B-5 and B-5 to B-22.
CX(s) Applied: B1.3, B1.15
Date: 06/12/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Install condensate return piping, insulation, piping support, and specific valves in the condensate return piping sections from T-40 to B-5 and B-5 to B-22.