PP-334-1 – Energia Sierra Juarez U.S. Transmission, LLC

Received 05/18/2022.

Pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 C.F.R. § 205.320 et seq., Energia Sierra Juarez U.S. Transmission, LLC (ESJ) hereby applies for an amendment to its Presidential Permit No. PP-334-1 (PP-334-1) to authorize an increase in the rate of transmission over ESJ’s operating electric power generation tie line (the ESJ Tie Line). PP-334-1 was issued on August 31, 2012, authorizing ESJ to construct and operate the ESJ Tie Line to transmit electricity across the border from Mexico into the United States.

Signed Presidential Permit

Application