The objective of this project is to conduct a Pre-Front-End Engineering Design (PreFEED) study for a new build 8 Rivers Hydrogen (8RH2) plant to en…
Office of NEPA Policy and Compliance
October 25, 2021The objective of this project is to conduct a Pre-Front-End Engineering Design (PreFEED) study for a new build 8 Rivers Hydrogen (8RH2) plant to enable a follow-on FEED study.