BPA proposes to replace the roof and siding of the pre-engineered metal control house at the Wendson Substation.…
Office of NEPA Policy and Compliance
July 14, 2020BPA proposes to replace the roof and siding of the pre-engineered metal control house at the Wendson Substation.