CX-021221: Electrical Capacity and Distribution Capability (ECDC) Project

The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argon…

Office of NEPA Policy and Compliance

August 29, 2019
minute read time

The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argonne site.