CX-021021: Mead - Perkins Structure 299/3 Insulator Replacements

The Western Area Power Administration (WAPA) is proposing to replace broken/malfunctioning insulators on the Mead - Perkins (MED-PES) 500-kV transm…

Office of NEPA Policy and Compliance

October 30, 2019
minute read time

The Western Area Power Administration (WAPA) is proposing to replace broken/malfunctioning insulators on the Mead - Perkins (MED-PES) 500-kV transmission line at structure 229/3.