CX-020545: Salmon Creek (LURR 20180295)

Bonneville Power Administration (BPA) proposes to allow Kessi Engineering (Kessi) to install a low-pressure sanitary pipe through BPA’s RossLexingt…

Office of NEPA Policy and Compliance

September 10, 2019
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to allow Kessi Engineering (Kessi) to install a low-pressure sanitary pipe through BPA’s RossLexington-No. 1 transmission right-of-way (ROW). A 15-foot wide by approximately 250-foot
long easement would be granted to Kessi to install a 2-inch PVC pipe in the access road that crosses the ROW. A 3-foot deep by 2-foot wide by 250-foot long trench would be dug in the road prism. The excavated soils would be used to refill the trench after the pipe has been installed. Additionally, a non-fish passage culvert would be removed and reinstalled to accommodate the sanitary pipe installation.